
SPECIFICATION
Structure
Earthquake-resistant raft foundation structure RCC frame structure with sand base light-weighted block wall.
Wall finish
Internal: walls having pop punning with primer coat/single coat mala plaster. External: Double coat sand-based plaster or texture finish cladding as per elevation.
Ceilings: expose RCC with rendering.
Ceilings: expose RCC with rendering.
Flooring
Designer vitrified tiles flooring for drawing, living, dining, kitchen, all bedrooms, and passage anti-skid rustic tile flooring for the deck.
Vitrified tiles flooring in all bathrooms & vitrified tiles dado up to lintel level
Vitrified tiles flooring in all bathrooms & vitrified tiles dado up to lintel level
Kitchen
Mirror polished natural granite kitchen platform with ss sink.
High-quality vitrified tiles dado up to lintel level on the walls above the platform.
High-quality vitrified tiles dado up to lintel level on the walls above the platform.
Doors
Main door of the design a veneer-clad flush door with a wooden frame.
Internal doors of laminated flush doors or colored flush doors with wooden frames.
Internal doors of laminated flush doors or colored flush doors with wooden frames.
Windows
Specially designed aluminum glass shutters and panels (DGU).
Plumbing
Concealed plumbing of good quality upvc, cpvc pipes. C.P. Fittings & sanitary ware of reputed brands.
Top of the line cp fittings and sanitary wares.
Separate hot and cold water lines for all wet areas.
Centralized geyser system with provision of individual heat pump or gas geyser.
Top of the line cp fittings and sanitary wares.
Separate hot and cold water lines for all wet areas.
Centralized geyser system with provision of individual heat pump or gas geyser.
Electrification
Three phase concealed copper wiring with good quality accessories and sufficient electric points.
Inverter outlet provision for necessary electric points.
Inverter outlet provision for necessary electric points.
Paint
Exterior painting of fully acrylic paint.
Internal walls double coat putty finish.
Internal walls double coat putty finish.
Wash area
Anti-skid flooring with dado of vitrified tiles up to sill level.
Provision of electric and plumbing point for washing machine.
Provision of electric and plumbing point for washing machine.
Elevator
Good quality fully automatic elevators.
Water
24-hour water supply by common borewell to an overhead water tank by pressure pump.
Drainage
Main drainage line is provided by GMC.
Have a question?
We are glad to consult you!
We are glad to consult you!
Sales office
The Palace, Royal Street, Nr. Gift City, PDEU Road,
Koba, Gandhinagar-382421
Opening hours: 9:00 — 19:00
The Palace, Royal Street, Nr. Gift City, PDEU Road,
Koba, Gandhinagar-382421
Opening hours: 9:00 — 19:00
Project by

Polaris Group Polaris Group has been a leader in the Real Estate industry for almost two decades. From changing skylines to ensuring inspiration and innovation in every project, their vision is based on determination & hard work.
Rera No : PR/ GJ/ GANDHINAGAR/ GANDHINAGAR/ Others/ RAA11816/ 220523
Rera Website : https://gujrera.gujarat.gov.in/
Rera Website : https://gujrera.gujarat.gov.in/
Project by

We’ve illuminated the skyline for over 25 years, consistently creating landmarks. Each project represents a fresh endeavor that evolves with the times, combining the art of crafting superior-quality structures through contemporary techniques, meticulously supervised by our dedicated civil team.